Non-Validated Tags
Tags are used to identify or mark records for filtering, sorting, and reporting purposes.
Tags can be created and made available to all Tags fields throughout the system or can be created for specific Tags fields on specific forms. When created for a specific Tags field on a specific form, the list of available Tags for that field will be limited to those Tags assigned to that field and form. Tags that have not been assigned to a specific field and form will be available to all Tags fields on all forms. After data is tagged, it can be filtered, sorted, and grouped using the filtering and grouping features on the register containing the data.
Non-Validate Field Examples
| Examples |
Description |
|---|---|
|
Risk description |
Identify specific risks against cost items |
|
Superintendent |
Identifies responsible person for operations and forecasting |
|
Commodities |
Grouping cost items for roll-up and review for specific commodities |
|
Client Tagging |
Specific cost item tagging for client |
|
External System Flag |
External flags for integration |
|
AWP Planning |
Assign a cost item to a Work Plan for operations |
Users can take advantage of validated and non-validate tags in every register within estimate. It will be up to the organization on how they want to best leverage tags in each register.
Register Examples
Creating Non-Validate Tags
The following steps walk you through how to create non-validate tags within a Cost Item Record.
Step by Step — Non-Validate Tags in Cost Item Record
-
From the Ribbon, select the Estimate tab.
-
Then select Cost Breakdown Structure (CBS).
-
Double-click the row that you want to assign tags. The Cost Item Record for that row opens.
-
e.g., Direct Cost Add-On, Indirect Cost Escalation, etc.
-
-
Select the User Defined default data block in the lower right portion of the record.
-
Click into the User Defined 1 field and type in the value needed for the cost item.
The following steps walk you through how to create non-validate tags within the register.
Cell select and fill down shortcuts can expedite the assigning process.